TEL:+86 0536-6162866+86 187-6464-2379
ADD:No.19, Shunde Road, Zhucheng City, Shandong, China
WEB:www.onvestcapital.com
TLFS-20 20kg medical waste clinical waste incinerator for hospital garbage treatment
-
MS:Katherine Wong
+86 187-6464-2379
-
TEL:+86 0536 6162866
MAIL:sales@cntianlang.com
TLFS model smokeless clinical Waste Incinerator for hospital garbage treatment
product description:
1. medical waste incinerator for garbage treatment is a kind of various hospital waste treatment method.
2. The medical waste Incinerator can reduce the solid mass of the original waste by 80–85% and the volume reduced by 95–96%.
3. The highest temperature of incinerator runing can reach 1100-1300 degrees Celsius, which can achieve the effect of sterilization and disinfection.
4. There will be no smoke, no smell, no pollution after waste be burning.
5. It features unique and advanced merits with compact size, high burning effect, reasonable burning technology, high degree of non-harm etc. It is an ideal choice for waste treatment of hospitals, hotels and various areas.
Product Application
1.Medical waste: syringes, neddles, gloves, straps, gauze, blood vessels, organs and other infectious waste.
2. Industrial waste (polymer waste): Plastic PE, PU, rubber (tire), Styrofoam, PET bottle, fiber, foam, cloth, bags, resin, acrylic, leather, Wood flour, urea powder, melon cloth, tapes, paints, polymers and so on.
3. General resort hotel garbage: cardboard, paper scraps, sawdust, leaves and so on.
4. Special waste: waste oil, waste solvents, oil sludge, ash dust, iron paint, mold filter residue and so on.
5.Animal carcass cremation. pet, dog,chicken,fish waste.
incinerator structure:
working principal:
There are four chambers, two combustors for friendly environment in TLFS model waste incinerator. There will be no smoke, no smell, no pollution after be burning.
it was devided into :
1.primary combustion chamber
It is Primary pyrolysis gasifying, Organic matters in the waste would be decomposed into combustible gas in pyrolysis gasifying
method.
2.second combustion chamber
The temperature of secondary combustion chamber should be controlled above 850℃, and the residency time more than 2s.
3.mixture of combustion chamber
Turbulent combustion would remove black smoke and peculiar smell thoroughly. Dioxin and other toxic and harmful objects would be
inhibited to produce from the source.
4. smoke purification chamber
There is an gas absorbtion chamber, it can absorb the gas again.
5.chimney
it can cool down the tempreture of gas.
incinerator application site:
incinerator certificates:
incinerator client's feedback
You could contact me at any time on Whatsapp 008618764642379
Best Regrads.
Katherine Wong ? Sales Manager